newheek hand switch
mechanical x-ray push button switch manufacturers Hand switch with RJ connector test method

Hand switch with RJ connector test method

Knowledge article

Sometimes, there are some x ray hand switch connected with x ray machine by different RJ connectors, and we don’t know which wires control exposure ready status and which wires control exposure status...

Author:Hand Switch Manufacturer    Time:5月 26, 2026

Sometimes, there are some x ray hand switch connected with x ray machine by different RJ connectors, and we don’t know which wires control exposure ready status and which wires control exposure status, how could we know the wires definition?

Now, let me teach you the RJ connector wire definition testing method, let’s begin:

First, let us see the normal RJ connect models and pictures:

rj connector of x ray switch

 

Next, prepare the testing tool– multimeter

testing rj connector multimeter

Then, start to test:

Please look at the next section for details. Testing method of hand switch with RJ connector

 

Information on this page involves equipment interfaces, wiring or compatibility. For a technical review specific to your equipment, please contact our team.



Service hotline: +86 17616362240 / TEL: +86 17616362240 / Email: aide@newheekxray.com    aide@newheekxray.com

    

Online Message 

Copyright 2018-2023  Newheek x ray hand switch and foot switch supplier All Rights Reserved. sitemap

Mobile DR  UC-arm X-ray Machine  X-ray Collimator  X-ray Image Intensifier  X-ray Grid

X-ray High Voltage Cable  X-ray Bucky Stand  Radiography Table  X-ray Machines and Accessories  Flat Panel Detector

WhatsApp     YouTube      Instagram      LinkedIn      Facebook  

ADD-Factory: E Building of Future Star Scientific Innovation Industrial Zone of No.957 Wolong East Street,
Yulong Community, Xincheng Sub-District Office, Weifang Hi-tech Zone, Shandong Province, China